Skip to main content
x
Title Design for Central Teaching Facilities, Refurbishment of old Labs and Dairy Value Chain at Kabanyolo;Design Review and Supervision of Civil works under the Support to Higher Education, Science and Technology (HEST) Project Lot 1: MUK
Client Makerere University main campus and Kabanyolo
Location Kampala
Project Cost USD 12,880,109
Year 2015

Design for Central Teaching Facilities, Refurbishment of old Labs and Dairy Value Chain at Kabanyolo ;Design Review and Supervision of Civil works under the Support to Higher Education, Science and Technology (HEST) Project Lot 1: Makerere University

Refurbishing and Re-equipping of Old Laboratories

The selected existing laboratories for refurbishment/ or remodeling shall be re-equipped with up-to-date facilities include:

  • Labs at College of Natural sciences (CONAS);
  • College of Health Sciences (CHS);
  • College of Engineering, Arts and Design (CEDAT);
  • College of Veterinary and Biosafety (COVAB); and
  • College of Education and External Studies (CEES)

Remodeling and renovation works shall include facilities standby power/backup, toilets/plumbing and accesses to minimise dust contamination.

Central Teaching Facilities

These two structures that were constructed at slab level are located at the current College of Business and Management Sciences (COBMAS) and College of Humanities and Social Sciences (CHUSS). These shall be checked for structural soundness and redesigned accordingly to cater for more spaces and floors in order to accommodate both teaching and research laboratories and associated shared ancillary facilities that shall include but not limited to toilets, parking, standby power, accesses, landscaping and beautification.

The client anticipates that the structure next to COBMAS shall be redesigned up 7-storeys while that next to CHUSS shall be redesigned up to 4-storeys.

Rehabilitation and Modeling of Diary Value Chain at Kabanyolo

The proposed facilities shall be assessed and renovated so as to support agriculture students and staff to develop and enhance innovation and entrepreneurship in dairy farming.

 

The consultancy services also included design review and construction supervision including the defects liability period.

 

Carryout a comprehensive design review; Construction Supervision and Management up to defects liability period.

Project Year
2015